In a lego airplane building lean simulation designed to show participants how the 8 wastes create barriers to smooth production flow on a factory floor,articlePost_image Frank discusses what wastes the participants observe. In Lean Manufacturing, we look for the 8 wastes, originally developed by Shigeo Shingo at Toyota. Using the acronym DOWNTIME, the Lean Manufacturing Engineer helps the team look for:

Defects

Overproduction

Waiting

Non-value added processing

Transportation

Inventory (imbalance-too much, too little)

Motion

Employees-not fully utilizing the talents and capabilities of your workforce

What wastes do you see in the picture above?